spk-logo-white-text-short2
0%
1-888-310-4540 (main) / 1-888-707-6150 (support) info@spkaa.com
Select Page

Sample PTC Integrity Reporting

Written by SPK Blog Post
Published on January 22, 2018

Download the Requirements Traceability Report 
This report starts with a Market Requirements document, and traces down to the Tests and Test Results.
Sheet 1 covers compact categorization, where the artifacts are basically defined by the Document types.
Sheet 2 includes data categorized by both Document type (Item type) and Category value.
Sheet 3 categorizes data by Document type, Category value for the content, and containing Document instance (Document ID).
Download the Requirements Traceability Report here.

Download the Medical Device Design Input Output Verification Validation Report
Sheet 1 traces from Market Requirements through System Requirements to Validation Tests (and associated results).
Sheet 2 traces from System Requirements through System Architecture design specifications, to Verification Tests (and associated results).
Download the Medical Device Design Input Output Verification Validation Report here.

Download the Validation Test Summary Report
This report starts with a Validation Test Protocol document, and traces to the System Requirements that the tests validate as well as the test results for those tests.
The summary data is obtained from the Test Objective that is related to the Validation Test Protocol document, demonstrating the flexibility that version 2.7 of the SPK Trace Report Engine has around sourcing the summary page data for the report.
Download the Validation Test Summary Report here.

 

Latest White Papers

10 AI Use Cases: Accelerating Automotive Embedded Development

10 AI Use Cases: Accelerating Automotive Embedded Development

Software-defined and electric vehicles are only increasing as automotive technology advances. As these features grow, automakers must adapt. Manufacturing a car is not the same as it was years ago. This eBook explores how AI can be used in the automotive development...

Related Resources

Why Aerospace Programs Miss Deadlines Part 2

Why Aerospace Programs Miss Deadlines Part 2

Key Takeaways A connected digital thread helps prevent schedule delays: Linking CAD, simulation, PLM, ALM, and DevOps gives aerospace teams better visibility into dependencies, changes, and risks across the lifecycle. Earlier validation reduces costly rework: Creo and...

What CIOs Get Wrong About PLM and Digital Thread Strategy

What CIOs Get Wrong About PLM and Digital Thread Strategy

PLM and Digital Strategy for CIOs Hello, everyone, and welcome back to another SPK and Associates vlog. My name is Michael Roberts. I'm the Vice President of Sales and Marketing here at SPK and Associates. Today, we're tackling a topic that comes up consistently in...