spk-logo-white-text-short2
0%
1-888-310-4540 (main) / 1-888-707-6150 (support) info@spkaa.com
Select Page

How to setup a weekly backup job with Bacula

Written by SPK Blog Post
Published on May 16, 2011

In my last post, I gave an overview of Bacula, the enterprise-level free backup software. For this post I wanted to dig into the software a bit more and show how simple it is to setup a weekly backup job.

One of the first things we do at SPK when working with a new client is to establish what sort of backup plan they currently have in place and if it is adequate enough. Part of the infrastructure support service that SPK provides includes managing backups and ensuring that nothing mission critical is lost due to hardware failure or even user error. So when discussing this with a client, I often come up with a simple backup plan for data. The most common backup scheme is what I refer to as a Weekly Backup. It’s non-intrusive to the end user, it provides very good coverage of data and is reasonably fast depending on how much is being backed up and how often the data changes.

The scheme is as follows:

Full Backup on Saturday -> Incremental Sunday through Friday -> Full Backup on Saturday

and so on. The last Saturday of the month, the full backup that was performed is sent off-site for 6 months. This ensures data is safe in case of a disaster (fire, earthquake, etc..). If there was a hardware failure, the only data loss would be up to that point from midnight or whenever you run

So how does Bacula fit into all of this? I’ve written up a HOWTO document which details how easy it is to implement. Check it out, and let me know what you think in the comments section!

Related Resources

Why Late-Stage Changes Are Killing Your Time to Market

Why Late-Stage Changes Are Killing Your Time to Market

Key Takeaways Late-stage changes get expensive fast: The farther a problem travels through design, testing, and manufacturing, the more time, cost, and rework it creates. Disconnected systems and weak traceability are major causes: When requirements, design, software,...

5 Ways to Reduce Engineering Cycle Time Without Adding Headcount

5 Ways to Reduce Engineering Cycle Time Without Adding Headcount

Key takeaways Faster engineering does not always require more headcount: Disconnected systems, manual handoffs, rework, and poor visibility often create more delays than a lack of engineering capacity. A digital thread can eliminate major sources of wasted time:...

The Engineering Digital Thread Playbook

The Engineering Digital Thread Playbook

In many organizations, systems operate independently, creating a large visibility problem. A digital thread addresses this by creating a connected flow of product information across the lifecycle. This playbook explains why engineering visibility matters, and how...