spk-logo-white-text-short2
0%
1-888-310-4540 (main) / 1-888-707-6150 (support) info@spkaa.com
Select Page

How to Count Days in State Within a PTC Integrity Report

Written by SPK Blog Post
Published on July 9, 2015

In the second of a group of supplemental articles on Metrics, Metrics, Metrics I am going to examine how you can report on days in state within your PTC Integrity Lifecycle Manager application. Of course your very first questions are likely going to be is “What the heck does days in state mean, and why should I care?” Well, to put it simply when we talk about days in state, we are talking about how long a particular item has been at a given step in its lifecycle.  If we were talking about a defect, you would probably care how long it takes from the time the defect was initially identified and entered into your PTC Integrity Lifecycle Manager system until that defect was assigned to a developer to be repaired.

Now you are probably saying, “Okay, I see your point.  It shouldn’t be that difficult…. I can save the initial date I enter a state, then use the time I leave the state to calculate the number of days I was in that given state.”  This is where PTC Integrity Lifecycle Manger makes things easy for you, with a couple of computation functions you can use directly within your reports.  These two computation functions are called DaysInState and DaysCurrentState.  You can place these computation functions directly into your report, so there is no need to add additional fields on your item type.

In the following example I have created a simple report that will find all the open Defects and Change Requests in your PTC Integrity Lifecycle Manager system, and display them.  As you can see in the output, I have included the days the current item has been in the current state:

How to Count Days in State Within a PTC Integrity Report1

The mechanics of building the report are rather simple.  A similar example can be found in a previous article called “Metrics Metrics Metrics, Round 2” so I won’t be going through all the steps again here.

The main difference between this report and the simple report from the earlier article has to do with the use of the computation function DaysCurrentState as you can see below:

How to Count Days in State Within a PTC Integrity Report2

The computation function automatically performs the calculation that determines how many days the each item has been in the given state, and displays the result in the specified column in your report.

Likewise, if you were looking at completed Defects, you may decide that you would like a report that would tell you how long each of the defects spent awaiting assignment, and how long they were in development, and maybe how long they took being tested. Using the DaysInState computation function we would create a report with the following columns:

How to Count Days in State Within a PTC Integrity Report3

Where we would use the DaysInState to calculate the number of days for each of the states we are interested in on each of the items in the report.  This would give us a report that would look something like this:

How to Count Days in State Within a PTC Integrity Report4

As you can see, these two computation functions, DaysCurrentState and DaysInState can be handy ways of determining day calculations on the fly.  PTC Integrity Lifecycle Manager provides many such computation functions as labour saving features of the system. In future articles I may discuss more of them and how they can assist you in configuring and maintaining PTC Integrity Lifecycle Manager.

Next Steps:

Latest White Papers

How to Prepare Your Organization for an AI Rollout

How to Prepare Your Organization for an AI Rollout

Managing your organization’s knowledge base may be challenging, especially if information is scattered across multiple systems. Discover how Atlassian’s AI Rovo agents help manage this.What You Will Learn In this eBook you will discover: Why knowledge management...

Related Resources

Making the Leap from IBM Rational DOORS to Modern ALM Solutions

Making the Leap from IBM Rational DOORS to Modern ALM Solutions

For years, IBM Rational DOORS has been a cornerstone for requirements management in highly regulated industries. Unfortunately, as development practices evolve, DOORS has not evolved with them. One of the biggest challenges with this is that there’s no direct upgrade...

Fast Answers, Fewer Meetings: Building a Smart Knowledge Culture

Fast Answers, Fewer Meetings: Building a Smart Knowledge Culture

If your day feels like a relay race between status calls and Slack pings, you’re not alone.  Most teams still default to “let’s meet” when they can’t find an answer quickly.  However, the cost of this is real. Slow decisions, fragmented knowledge, and “do-overs”...

The Role of Managed Services in Scaling Engineering Projects

The Role of Managed Services in Scaling Engineering Projects

Introductions Hi everybody. I'm Michael Roberts, Vice President of Sales and Marketing here at SPK and Associates. And today we're discussing a topic that's shaping the future of product development and engineering. And that's the role of managed services and managed...