spk-logo-white-text-short2
0%
1-888-310-4540 (main) / 1-888-707-6150 (support) info@spkaa.com
Select Page

Automatic Processing of Content on SolidWorks Workgroup PDM Server

Written by Edwin Chung
Published on November 25, 2013

One of the powerful features of a full enterprise product lifecycle management (PLM) system is being able to post process content uploaded to it. For example, adding a watermark, or changing a revision of a document automatically. The idea behind Solidworks Workgroup PDM Server is for small groups of MCAD engineers to be able to share and collaborate on drawings, parts, etc.. But what if we want to be able to add a draft watermark to a Solidworks drawing, or have a custom field populated when the item is checked-in?

We can do this by enabling a few options in the operating system and setting up triggers within the Workgroup PDM Server software. I’ve written up a document on how to do this, feel free to download it here. If you have any comments or questions, send them my way, I’ll be happy to assist!

Next Steps:

Edwin Chung
Client Program Manager, SPK & Associates

Latest White Papers

A Checklist for Reducing Time to Market in Engineering

A Checklist for Reducing Time to Market in Engineering

Product teams all have the same goal: produce high-quality products and reduce time to market. Achieving these goals simultaneously can be difficult, but your team doesn’t have to sacrifice one for the other. Learn how in this eBook.What You Will Learn In this eBook,...

Related Resources

How Product Teams Can Measure AI Coding ROI

How Product Teams Can Measure AI Coding ROI

Key Takeaways AI adoption alone does not prove ROI. Teams must measure how AI coding tools impact development speed, software quality, engineering capacity, and overall costs. Developer time saved must translate into business value. Tracking recovered hours,...

Forward Deployed Engineers vs. Consultants: What’s the Difference?

Forward Deployed Engineers vs. Consultants: What’s the Difference?

Key Takeaways Consultants, professional services, and managed services serve different purposes. Consultants provide strategic guidance, professional services focus on implementation, and managed services support ongoing operations. Forward Deployed Engineers (FDEs)...

End-to-End Traceability: From Requirements to Validation

End-to-End Traceability: From Requirements to Validation

Key Takeaways Clear requirements are the foundation of successful product development. Defining measurable requirements and acceptance criteria early helps teams prevent ambiguity and costly rework. Verification and validation serve different purposes. Verification...